Recreational sports enthusiasts will be pleased to know construction on Game On Arena is underway. The eight-acres of outdoor and indoor sports fields and facilities is located near I-30 and Loop 820 in Fort Worth.
Currently, the building foundation and concrete installation is complete. Sub-grade electrical and plumbing rough-in work is complete. Site utilities are complete and site paving is about 80% complete.
The pre-engineered metal building is almost complete and we have begun the installation of exterior walls. Roof installation is about a week away, and more importantly, main AC units should arrive in 10 days. We’re hoping to get those powered up in two to three weeks. With the current heat and humidity levels, the inside temperature can reach 120-140 degrees; making it nearly impossible to continue interior work.
Game On is slated to be complete in September. Once done, there will be 8 full-size basketball courts and/or 12 full-size volleyball courts – the configuration is completely flexible. There will be batting cages, pitching cages, physical training and workout areas, 6 full-size sand/beach volleyball courts, concession areas, a place for parties, sports medicine, staff offices and shopping spaces.
This is going to be a terrific addition to Fort Worth!