We are pouring the slab Monday, August 29, and taking down the existing walls the following Tuesday, Sept 6. Once the walls are down, we’ll start our framing.
![Exterior of slab prep for The WARM Place](https://fortconstruction.com/wp-content/uploads/WARM-Place-Slab-Prep-H-1024x685.png)
![Exterior of slab prep for The WARM Place](https://fortconstruction.com/wp-content/uploads/WARM-Place-Slab-Prep-H-1024x685.png)
We are pouring the slab Monday, August 29, and taking down the existing walls the following Tuesday, Sept 6. Once the walls are down, we’ll start our framing.